Databases in the Cloud

SQL Server, safely to Azure

A flexible, scalable database, always with a backup in place.

  • A proven six-step process, from assessment to optimisation
  • Microsoft tooling: Azure Migrate and Azure Database Migration Service
  • We stay after the migration, because administering Azure is our daily work
Animation: a database moving from an on-premise server room into the cloud
Microsoft SQL ServerMicrosoft Azure
Scroll

01

A database that grows with your business

An on-premise SQL Server has hard limits: performance ends where the hardware does, and every upgrade means investment and downtime. Migrating SQL Server to Azure SQL Database is a strategic step that brings greater flexibility, scalability and cost efficiency.

Once migrated, you scale resources when you need them and monitor performance and usage continuously, without maintaining your own server hardware.

Animation: a database swelling with the workload while a fixed frame around it caps the maximum size

02

A migration method matched to your database

Not every database needs the same approach. We use three methods: lift-and-shift (moving as-is), migration with refactoring (adjustments to use cloud capabilities) and migration with re-architecture, when the application should take full advantage of Azure.

Migrating only part of a database is also possible if you don't want to move everything at once.

Animation: three migration methods compared, the light resting longer on the one matched to the database

03

How the migration runs in six steps

We start with assessment and planning: analysing workloads with Azure Migrate, understanding your data and applications, and estimating costs. After choosing the method, we prepare the migration: creating backups, configuring connectivity to Azure (VPN or ExpressRoute) and setting permissions.

The migration itself runs through Azure Database Migration Service, followed by testing of the transferred data and application functionality. Finally, we tune performance and configure scaling and resource monitoring. Depending on database size, the whole process takes from a few hours to a few days.

Animation: a six-step migration starting from a backup, with a rollback arc spanning the whole path

04

Why C4PL

A current backup is always created before the migration, so the database can be restored if anything goes wrong and the whole operation can be rolled back. We agree the date of the move and the length of the maintenance window in advance, together with the people who use the database.

We work on Azure every day: administering it, monitoring it and optimising costs. After the migration, we can look after your database long term, as your external IT department.

Animation: a status screen wired to the database with confirmed checks along the way

Outcome

What you get

Capacity that grows

You can increase resources without rebuilding the whole environment.

A safe recovery path

A backup protects your data if a migration or later change goes wrong.

A defined migration path

Every stage has a clear goal, outcome and condition for moving forward.

How we work

How we start

The first step is a talk and a look at what you already have.

  1. 1

    Need

    We listen to what is not working and what needs to change.

  2. 2

    Analysis

    We inventory the infrastructure, the risks and the dependencies.

  3. 3

    Plan

    We agree the scope, the order of work and the way back.

  4. 4

    Delivery

    We make changes in agreed maintenance windows.

  5. 5

    Operations

    We monitor, we respond and we plan what comes next.

Quick enquiry

Tell us what this is about

We will reply with where we would start and what we would need.

Prefer to talk? Call +48 795 449 334

1 What is it about?
2 How many people work at your company?
3 How should we reach you?

The data controller is C4PL Sp. z o.o., ul. Okólna 17E, 05-270 Marki, Poland (KRS 0000319749, NIP 5242667615, REGON 141681338). We process the data from this form to answer your enquiry and to carry on the conversation. You have the right to access, rectify and erase your data, and to object. Full details are in our Privacy policy.

FAQ

Before you ask

Does the database have to go offline during migration?

Yes. The database is unavailable while the data is moved. We agree the date and the length of the maintenance window before the migration, so you know in advance when and for how long it has to be switched off.

What if something goes wrong during the migration?

A full backup is created before the migration. If problems occur, data is restored from the backup, and the migration itself can be rolled back to the pre-change environment. After the move, we test data and applications before calling the job done.

Will our applications and tools work with Azure SQL Database?

Many database management tools support Azure SQL Database, though some features may differ. That is why we review your applications during assessment, propose migration with refactoring where needed, and test everything after the move.

Let us start with a conversation

Describe the problem. We set the scope, the order of work and the timeline together.